A portion of I-85 through Atlanta will be closed indefinitely due to a bridge collapse caused by a major fire. For RV'ers passing through, the best alternative would be the I-285 loop.

I-85 Bridge Collapse
Dutch
2001 GBM Landau 34' Class A
F53 Chassis, Triton V10, TST TPMS
2011 Toyota RAV4 4WD/Remco pump
ReadyBrute Elite tow bar/Blue Ox base plate

RoyM

  • ---
  • Posts: 1976
Re: I-85 through Atlanta closed
« Reply #1 on: March 31, 2017, 11:13:02 AM »
I have not been to Atlanta but I can just imagine the gridlock. :o
Ram 2500 diesel
Prowler fifth wheel
Urge to travel

John From Detroit

  • ---
  • Posts: 19799
  • ^My New Home^
    • Diabetics Forum
Re: I-85 through Atlanta closed
« Reply #2 on: March 31, 2017, 05:28:16 PM »
This morning on Ham Radio, the "72 Chew" (delete space add dot net) the opening Net Control was from just N.E. of Atlanta (near the Mall of GA)

So naturally it was a major topic of discussion

A Storage yard full of PVC conduit for Fiber Optic transmission lines caught fire.
Nothing adds excitement like something that is none of your business
My Home is where I park it.

Rene T

  • ---
  • Posts: 10169
  • Great being on the right side of the grass
Re: I-85 through Atlanta closed
« Reply #3 on: March 31, 2017, 05:29:42 PM »
This morning on Ham Radio, the "72 Chew" (delete space add dot net) the opening Net Control was from just N.E. of Atlanta (near the Mall of GA)

So naturally it was a major topic of discussion

A Storage yard full of PVC conduit for Fiber Optic transmission lines caught fire.

Was the storage yard under the overpass?
Rene & Lucille & co-pilot Buddy
AKA  Pep N Mem
2011 Chevy Duramax 2500 HD 4X4
2011 Montana High Country 343RL
From the Granite State of NH
& Florida Snowbird in Lakeland FL

LarsMac

  • ---
  • Posts: 409
  • Larry and Margo With Ami the Chi-cha
Re: I-85 through Atlanta closed
« Reply #4 on: March 31, 2017, 07:08:12 PM »
The highway northbound, just before the GA-400 split is where the collapse happened. If taking 400 north is part of your travel route, then you will have to stay in I-75 to 285, and go east to 400. If you were going through Atlanta on I-85, you will probably want to take the east side I-285 beltway around town.



 
2000 Itasca Sundancer 430V
2007 Saturn Vue

If you lose your sense of humor, it's just not funny anymore. - Wavy Gravy

John From Detroit

  • ---
  • Posts: 19799
  • ^My New Home^
    • Diabetics Forum
Re: I-85 through Atlanta closed
« Reply #5 on: April 01, 2017, 06:53:06 AM »
Was the storage yard under the overpass?

Either under it or right beside it or both.... I've seen some videos.....

Reminds me of going to NYC to pick up darling daughter at Julliard... East bound no problem
but returning we had to take about ga 40 mile detour.. Seems a couple of fuel tankers and a meeting of the tanks on top of what used to be a bridge....
Nothing adds excitement like something that is none of your business
My Home is where I park it.

Stephen S.

  • ---
  • Posts: 992
  • Marshmallows and Irish Cream. Mmmm.
Re: I-85 through Atlanta closed
« Reply #6 on: April 01, 2017, 06:46:14 PM »
About 350 feet of both Northbound and Southbound I-85 have to be removed and rebuilt. It's going to take months. The damage is going to be more than just the roadway. With traffic diverted, small businesses are going to suffer.

In business it's location, location, location. Now a lot of the people who would have gone to that area are going to avoid it, for months.

It is one of the major "trunks" of the highway system in the Atlanta area.


[edit]
Just checked the news websites. A homeless man is under arrest for starting the fire. He frequented the area as a place to smoke crack.
« Last Edit: April 01, 2017, 06:53:12 PM by srs713 »
Stephen S.
===============
'99 Winnebago Chalet
2002 VW Beetle
2007 Yamaha TW200
Home town: Mableton, GA

Rene T

  • ---
  • Posts: 10169
  • Great being on the right side of the grass
Re: I-85 through Atlanta closed
« Reply #7 on: April 01, 2017, 08:53:42 PM »
[edit]
Just checked the news websites. A homeless man is under arrest for starting the fire. He frequented the area as a place to smoke crack.

They actually arrested 3 guys.
Rene & Lucille & co-pilot Buddy
AKA  Pep N Mem
2011 Chevy Duramax 2500 HD 4X4
2011 Montana High Country 343RL
From the Granite State of NH
& Florida Snowbird in Lakeland FL

WILDEBILL308

  • ---
  • Posts: 2439
Re: I-85 through Atlanta closed
« Reply #8 on: April 01, 2017, 08:59:56 PM »
Watched the report on the news tonight. WHAT A MESS. They were talking atleast Laborday before it is repaired.
Bill
2003 Bounder 38N
300 HP 5.9 Cummins
Allison 3000MH Trans.
Towing 2014 Honda CRV
Home base Fort Worth, Texas
A man who carries a cat by the tail learns something he can learn in no other way.
-Mark Twain-

Rene T

  • ---
  • Posts: 10169
  • Great being on the right side of the grass
Re: I-85 through Atlanta closed
« Reply #9 on: April 01, 2017, 09:04:51 PM »
Watched the report on the news tonight. WHAT A MESS. They were talking atleast Laborday before it is repaired.
Bill

I'll bet they get it repaired a lot sooner than that.  They were already breaking up the old concrete and I would thing that by next weekend, all the debris will be gone. They'll be working 24 hours a day I would think to get it fixed.
Rene & Lucille & co-pilot Buddy
AKA  Pep N Mem
2011 Chevy Duramax 2500 HD 4X4
2011 Montana High Country 343RL
From the Granite State of NH
& Florida Snowbird in Lakeland FL

NY_Dutch

  • ---
  • Posts: 3474
  • Following the warm weather!
Re: I-85 through Atlanta closed
« Reply #10 on: April 01, 2017, 09:11:50 PM »
I'll bet they get it repaired a lot sooner than that.  They were already breaking up the old concrete and I would thing that by next weekend, all the debris will be gone. They'll be working 24 hours a day I would think to get it fixed.

I understood from one report, that the precast beams needed for the repair are non-standard lengths and have to be custom fabricated. I don't know how much delay that will add though.
Dutch
2001 GBM Landau 34' Class A
F53 Chassis, Triton V10, TST TPMS
2011 Toyota RAV4 4WD/Remco pump
ReadyBrute Elite tow bar/Blue Ox base plate

Olustee bus

  • ---
  • Posts: 49
Re: I-85 through Atlanta closed
« Reply #11 on: April 03, 2017, 06:57:52 AM »
Thank God they have a temporary fix.

Rene T

  • ---
  • Posts: 10169
  • Great being on the right side of the grass
Re: I-85 through Atlanta closed
« Reply #12 on: April 22, 2017, 02:07:32 PM »
Just read this from a article written 4 days ago.  The projected completion date is June 15th:


But on Wednesday, McMurry announced the contractor behind the repairs, C.W. Matthews, can earn an extra $1.5 million for completing the project by May 25 – three weeks earlier than the target completion date..

According to AJC’s David Wickert, the contractor could earn $2 million for completing it by May 21 and $200,000 for each day before that, up to a total of $3.1 million.

« Last Edit: April 22, 2017, 02:14:02 PM by Rene T »
Rene & Lucille & co-pilot Buddy
AKA  Pep N Mem
2011 Chevy Duramax 2500 HD 4X4
2011 Montana High Country 343RL
From the Granite State of NH
& Florida Snowbird in Lakeland FL

NY_Dutch

  • ---
  • Posts: 3474
  • Following the warm weather!
Re: I-85 through Atlanta closed
« Reply #13 on: April 22, 2017, 06:26:07 PM »
With incentives like that, I sure hope there's some really good quality inspectors on the job! 24/7! ;)
Dutch
2001 GBM Landau 34' Class A
F53 Chassis, Triton V10, TST TPMS
2011 Toyota RAV4 4WD/Remco pump
ReadyBrute Elite tow bar/Blue Ox base plate

xrated

  • ---
  • Posts: 467
Re: I-85 through Atlanta closed
« Reply #14 on: April 23, 2017, 04:06:29 AM »
With incentives like that, I sure hope there's some really good quality inspectors on the job! 24/7! ;)

That's what I was just thinking.......incentive money to hurry up.....QC out the window unless there is some very tight inspection going on 24/7.  Nothing like have an extra truckload of rebar left over after the concrete is poured.....or a 55 gallon drum full of extra bolts and rivets.
2016 F350 Crew Cab Dually King Ranch Diesel
2017 Keystone Fuzion Impact 303
Track Bike  2008 GSX-R750
"If it ain't Fast......It ain't Fun

NY_Dutch

  • ---
  • Posts: 3474
  • Following the warm weather!
Re: I-85 through Atlanta closed
« Reply #15 on: April 23, 2017, 10:48:36 AM »
That's what I was just thinking.......incentive money to hurry up.....QC out the window unless there is some very tight inspection going on 24/7.  Nothing like have an extra truckload of rebar left over after the concrete is poured.....or a 55 gallon drum full of extra bolts and rivets.

Yep... "Slump tests? We don't need no stinkin' slump tests!" :)

(A slump test is an onsite way of determining if the concrete mix in each truck meets basic specs.)
Dutch
2001 GBM Landau 34' Class A
F53 Chassis, Triton V10, TST TPMS
2011 Toyota RAV4 4WD/Remco pump
ReadyBrute Elite tow bar/Blue Ox base plate

Rene T

  • ---
  • Posts: 10169
  • Great being on the right side of the grass
Re: I-85 through Atlanta closed
« Reply #16 on: May 13, 2017, 07:29:33 AM »
The bridge is now open. I posted this info April 22nd:

Just read this from a article written 4 days ago.  The projected completion date is June 15th:


But on Wednesday, McMurry announced the contractor behind the repairs, C.W. Matthews, can earn an extra $1.5 million for completing the project by May 25 – three weeks earlier than the target completion date..

According to AJC’s David Wickert, the contractor could earn $2 million for completing it by May 21 and $200,000 for each day before that, up to a total of $3.1 million.


Pretty good incentive
« Last Edit: May 13, 2017, 07:31:08 AM by Rene T »
Rene & Lucille & co-pilot Buddy
AKA  Pep N Mem
2011 Chevy Duramax 2500 HD 4X4
2011 Montana High Country 343RL
From the Granite State of NH
& Florida Snowbird in Lakeland FL

John From Detroit

  • ---
  • Posts: 19799
  • ^My New Home^
    • Diabetics Forum
Re: I-85 through Atlanta closed
« Reply #17 on: May 13, 2017, 08:21:18 AM »
WOW.. In Darien, GA (McIntosh County) When I got there in 2011 they were working on the Highway 251 bridge over and interchange with I-95.... That was June 2011.

When I left.. 2 days ago.. Still working on it.
Nothing adds excitement like something that is none of your business
My Home is where I park it.

LarsMac

  • ---
  • Posts: 409
  • Larry and Margo With Ami the Chi-cha
Re: I-85 through Atlanta closed
« Reply #18 on: May 13, 2017, 12:26:30 PM »
The bridge is now open. I posted this info April 22nd:

Just read this from a article written 4 days ago.  The projected completion date is June 15th:


But on Wednesday, McMurry announced the contractor behind the repairs, C.W. Matthews, can earn an extra $1.5 million for completing the project by May 25 – three weeks earlier than the target completion date..

According to AJC’s David Wickert, the contractor could earn $2 million for completing it by May 21 and $200,000 for each day before that, up to a total of $3.1 million.


Pretty good incentive

I can't help but wonder how they managed to complete it so fast.
I believe I will stay with 285 on my trip through Atlanta.
2000 Itasca Sundancer 430V
2007 Saturn Vue

If you lose your sense of humor, it's just not funny anymore. - Wavy Gravy

Rene T

  • ---
  • Posts: 10169
  • Great being on the right side of the grass
Re: I-85 through Atlanta closed
« Reply #19 on: May 13, 2017, 02:35:46 PM »
I can't help but wonder how they managed to complete it so fast.

Money talks.
Rene & Lucille & co-pilot Buddy
AKA  Pep N Mem
2011 Chevy Duramax 2500 HD 4X4
2011 Montana High Country 343RL
From the Granite State of NH
& Florida Snowbird in Lakeland FL

Stephen S.

  • ---
  • Posts: 992
  • Marshmallows and Irish Cream. Mmmm.
Re: I-85 through Atlanta closed
« Reply #20 on: May 13, 2017, 06:48:35 PM »
I can't help but wonder how they managed to complete it so fast.
I believe I will stay with 285 on my trip through Atlanta.

Around 100 workers on the project. 10 inspectors on site at all times. 3 shifts, working 24/7. Yup, weekends too. Those workers have racked up a LOT of overtime. This stretch of road is one of the most inspected in the nation.

The reason this seems fast is because of how other projects are done. Normal is for a company to get contracts for more projects than they have workers to cover. Then they move the workers around, without fully manning any one job. And they usually only work day shift on weekdays. All because those contracts pay what they pay, whether they get done on time or late.

With the money waved in front of their faces for early completion, the bosses decided to go all out on the manpower. Just the 3 shifts cut the time in thirds. Then toss in weekends and being fully manned... early completion bonuses work!


[edit] The weather helped too. Only 1 day lost to rain.
Stephen S.
===============
'99 Winnebago Chalet
2002 VW Beetle
2007 Yamaha TW200
Home town: Mableton, GA

LarsMac

  • ---
  • Posts: 409
  • Larry and Margo With Ami the Chi-cha
Re: I-85 through Atlanta closed
« Reply #21 on: May 13, 2017, 09:11:45 PM »
Around 100 workers on the project. 10 inspectors on site at all times. 3 shifts, working 24/7. Yup, weekends too. Those workers have racked up a LOT of overtime. This stretch of road is one of the most inspected in the nation.

The reason this seems fast is because of how other projects are done. Normal is for a company to get contracts for more projects than they have workers to cover. Then they move the workers around, without fully manning any one job. And they usually only work day shift on weekdays. All because those contracts pay what they pay, whether they get done on time or late.

With the money waved in front of their faces for early completion, the bosses decided to go all out on the manpower. Just the 3 shifts cut the time in thirds. Then toss in weekends and being fully manned... early completion bonuses work!


[edit] The weather helped too. Only 1 day lost to rain.

OK. Thanks. I feel much better about it. I do use that section when coming up through Atlanta on the way to visit folks in the Alpharetta.
2000 Itasca Sundancer 430V
2007 Saturn Vue

If you lose your sense of humor, it's just not funny anymore. - Wavy Gravy

Stephen S.

  • ---
  • Posts: 992
  • Marshmallows and Irish Cream. Mmmm.
Re: I-85 through Atlanta closed
« Reply #22 on: May 14, 2017, 08:53:55 PM »
One of the things people keep talking about is that the tubing and other materials that were stored under the bridge are not very flammable. What everyone is missing is that the tubing is on large WOODEN spools! Those spools caught fire, burned hot enough to ignite the other materials, and that is why the fire was so hot and burned so long.

I'm glad it's over. And many, many utility agencies across the nation are looking at their own stored materials now.
Stephen S.
===============
'99 Winnebago Chalet
2002 VW Beetle
2007 Yamaha TW200
Home town: Mableton, GA

Lou Schneider

  • Forum Staff
  • ---
  • *
  • Posts: 7409
Re: I-85 through Atlanta closed
« Reply #23 on: May 14, 2017, 09:15:46 PM »
And when the wooden reels burn, they create a chimney effect through the middle of the stored material.  Can you say instant rocket stove?

Stephen S.

  • ---
  • Posts: 992
  • Marshmallows and Irish Cream. Mmmm.
Re: I-85 through Atlanta closed
« Reply #24 on: May 14, 2017, 09:38:10 PM »
And when the wooden reels burn, they create a chimney effect through the middle of the stored material.  Can you say instant rocket stove?

Yup!

Just looking at a Google Maps image from before the fire you can see the stacks of wooden reels. Dozens of rocket stoves waiting to be lit.
« Last Edit: May 14, 2017, 09:49:19 PM by srs713 »
Stephen S.
===============
'99 Winnebago Chalet
2002 VW Beetle
2007 Yamaha TW200
Home town: Mableton, GA

ysidive

  • ---
  • Posts: 23
  • Coachmen Freedom Express , 2011 Silverado 2500HD
Re: I-85 through Atlanta closed
« Reply #25 on: May 19, 2017, 07:25:46 PM »
Road is reopened in record time..... 6 Weeks from the date of the fire....

NY_Dutch

  • ---
  • Posts: 3474
  • Following the warm weather!
Re: I-85 through Atlanta closed
« Reply #26 on: May 19, 2017, 07:32:05 PM »
Road is reopened in record time..... 6 Weeks from the date of the fire....

You must have missed Rene's post on the 13th...

http://www.rvforum.net/SMF_forum/index.php/topic,103753.msg946096.html#msg946096
Dutch
2001 GBM Landau 34' Class A
F53 Chassis, Triton V10, TST TPMS
2011 Toyota RAV4 4WD/Remco pump
ReadyBrute Elite tow bar/Blue Ox base plate

Rene T

  • ---
  • Posts: 10169
  • Great being on the right side of the grass
Rene & Lucille & co-pilot Buddy
AKA  Pep N Mem
2011 Chevy Duramax 2500 HD 4X4
2011 Montana High Country 343RL
From the Granite State of NH
& Florida Snowbird in Lakeland FL

 

Hosted by Over The Network