SCVJeff
Well-known member
- Joined
- Jan 20, 2007
- Posts
- 1,304
I'm trying to fish a path between the bed where the main breaker panel is, and the "One-Place" panel probably no more than 8' away for a SurgeGuard panel. I am fishing between the One-Place wall where I can get into the space behind the hamper, and down, but get hung-up hard on what appears to be the floor ducting a few feet in. I have dropped lights down into the basement area at the breaker panel and tried to see them with a see-snake camera and nothin'. Has anyone ever made this run successfully or should I be looking at an alternative path over to the passenger side and then down and over (PITA, but dooable) ?
Also does anyone have the Freightliner drawings on a 34H showing the ducting in this area? The Winnie drawings quit at the floor and show nothing as far as cable routing.
Thanks, Jeff
Also does anyone have the Freightliner drawings on a 34H showing the ducting in this area? The Winnie drawings quit at the floor and show nothing as far as cable routing.
Thanks, Jeff