All:
Well: We started the construction on our re-roof of the garage and the addition of a Cover for the patio area. It will be timber beams and tongue & groove decking with Pavestone Floor, fireplace and grille.
I have attached photos from the first 4 days of work. The first was to remove limbs and half of our Red Oak tree which was going to be in the way of the roof eave. The first two shots show how much shade was there before we took out the trees. The second two show the progress of 3 days of framing. I have also attached a journal for the week.
Well: We started the construction on our re-roof of the garage and the addition of a Cover for the patio area. It will be timber beams and tongue & groove decking with Pavestone Floor, fireplace and grille.
I have attached photos from the first 4 days of work. The first was to remove limbs and half of our Red Oak tree which was going to be in the way of the roof eave. The first two shots show how much shade was there before we took out the trees. The second two show the progress of 3 days of framing. I have also attached a journal for the week.
Attachments
-
Garage 5-30 to 6-2-06.doc24 KB · Views: 48
-
Garage-Patio Cover 001 (Small).jpg65.1 KB · Views: 36
-
Garage-Patio Cover 006 (Small).jpg76.1 KB · Views: 23
-
Garage-Patio Cover 007 (Small).jpg79 KB · Views: 23
-
Garage-Patio Cover 014 (Small).jpg39.7 KB · Views: 26
-
Garage-Patio Cover 017 (Small).jpg74.4 KB · Views: 29