This campground does have 3 phase and has 50, 30amp sites. He wants to up grade to the new 50,30,20 amp Pedestals.
Just thought I would bypass the load calculations by asking.
I'll do the math tonight and figure out how many sites will go on a 4/0 or 250mcm Al. 3phase line with a 225amp breaker.