DeckArtist
Well-known member
The metal on the outside of the long portion of the slide was all messed up so it's going away and siding will be installed in it's place. Going with T&G pine beaded. Going to try and get the flooring and framing in tomorrow and maybe even the roof frame and plywood dried in. Will post pics around lunchtime of the gutting and again at dinner to show how far I got.
The travel trailer is going to move only twice as far as I know so I will be putting in a different roof system with no flange up top and a slight overhang over the siding along the long side.
The travel trailer is going to move only twice as far as I know so I will be putting in a different roof system with no flange up top and a slight overhang over the siding along the long side.