I-15 Virgin River Gorge AZ construction delays Feb. 9-11, 2016

The friendliest place on the web for anyone with an RV or an interest in RVing!
If you have answers, please help by responding to the unanswered posts.

ArdraF

Well-known member
Joined
Feb 12, 2006
Posts
10,673
The ongoing bridge replacement project continues on I-15 in Arizona and will be worse next week.  Speed will be reduced to 25 mph from 6:00 a.m. Feb. 9 through midnight Feb. 11 on the highway between St. George UT and Mesquite NV.  Road crews are trying to minimize vibrations on a fresh concrete pour on new bridge decks for a 66-hour period.  During that period all commercial truck traffic will be restricted to carrying loads of 40 tons or 80,000 pounds, the legal limit for trucks across Arizona.  Travel time through the Virgin River canyon is expected to be an hour longer than normal for those three days.

ArdraF
 
Top Bottom