Don't have much along the lines of pics, but have made some decent progress.
Got about 7 feet of the ceiling wired (lights, speakers, power) and closed up.
Built the frame for our new "entertainment center"and have been running wires into it.
Ordered a ton of stuff off Amazon, hopefully it'll be here by the weekend.
Still a fairly extensive list of stuff to do before closing walls and ceiling, but doable. I've been working a little each day, getting help as I can.
Added wiring for 4 exterior lights, speakers and plugs today. I have 4 spot lights in going to wire in as well, and replacing current running markers and adding a few at the same time.
I'm going to do some basic led under carriage lighting on individual switches for each area I want lit up. 1 at the steps, 1 at the propane quick connect, 4 in the basement area, 1 at the hitch area.
Still lots to do, and hopefully I'll have decent progress pics this weekend