DonJordan
Moderator Emeritus
- Joined
- Jan 29, 2005
- Posts
- 353
Well, Betty and I bit the bullet and signed the contract today to have a 24x44 manufactured home placed on our lot here in Yuma.? We will still have our RV spot with full hookups on the west side of the lot but the manufactured home will take the place of the other RV spot on the east side of the lot.? Yuma county requires that this type of home must be "Pit Set".? A hole is dug deep enough so that when the home is set up on the supporting members, the house is even with the surrounding ground.? The pit should be dug and wiring conduits, phone and cable conduits, sewer line, wate line, etc. in place through a poured concrete foundation wall that surrounds the pit by the middle of September.? We plan on being back here to watch and "oversee" the operation.? The house construction should start at the factory in Phoenix at about that same time.? It should be delivered to Pacesetter Homes around the first of October.? We then check it out, give a final approval, and it will then be delivered and set up on our lot.? We hope to be in by the middle of October.
Betty is having fun picking out all new appliances (we ordered the home without their standard appliances), new furniture, etc.? I go along as moral support? ;D ;D.
Once the home is in place I'll take some pictures and upload them.
Betty is having fun picking out all new appliances (we ordered the home without their standard appliances), new furniture, etc.? I go along as moral support? ;D ;D.
Once the home is in place I'll take some pictures and upload them.